Difference between revisions of "Griever/Benz Rental"

From HypertWiki
Jump to navigation Jump to search
m (→‎Nick Notes: link to repair invoice image)
m (→‎Nick Notes: accounting link)
Line 4: Line 4:
*Email from me to L&B on 7/18 mentions a “transmission issue” which may have been the electrical issue. Given that I was not notified when the vehicle became disabled, I will take that email's date as the date of disablement until convinced otherwise.
*Email from me to L&B on 7/18 mentions a “transmission issue” which may have been the electrical issue. Given that I was not notified when the vehicle became disabled, I will take that email's date as the date of disablement until convinced otherwise.
* [[:Image:2004-06-07 recpt 14 benz repair.1000h.jpg|2004-06-07 repair invoice]] ($2196.62)
* [[:Image:2004-06-07 recpt 14 benz repair.1000h.jpg|2004-06-07 repair invoice]] ($2196.62)
* [[SvsG:Benz Rental Accounting|Benz Rental Accounting]]

Revision as of 02:38, 7 December 2005

For official details of the Benz Rental part of Staddon vs. Griever currently in dispute, see S vs G: Plaintiffs' Second Request#Benz_Rental.

Nick Notes

  • Email from Lynne on 5/9 mentioned Benz in context of a functioning vehicle
  • Email from me to L&B on 7/18 mentions a “transmission issue” which may have been the electrical issue. Given that I was not notified when the vehicle became disabled, I will take that email's date as the date of disablement until convinced otherwise.
  • 2004-06-07 repair invoice ($2196.62)
  • Benz Rental Accounting