Difference between revisions of "Griever/Benz Rental"

From HypertWiki
Jump to navigation Jump to search
m (fixed plaintiffs' position link)
m (→‎Nick Notes: fixed smartquotes)
Line 2: Line 2:
==Nick Notes==
==Nick Notes==
*Email from Lynne on 5/9 mentioned Benz in context of a functioning vehicle
*Email from Lynne on 5/9 mentioned Benz in context of a functioning vehicle
*Email from me to L&B on 7/18 mentions a “transmission issue” which may have been the electrical issue. Given that I was not notified when the vehicle became disabled, I will take that email's date as the date of disablement until convinced otherwise.
*Email from me to L&B on 7/18 mentions a "transmission issue" which may have been the electrical issue. Given that I was not notified when the vehicle became disabled, I will take that email's date as the date of disablement until convinced otherwise.
* [[:Image:2004-06-07 recpt 14 benz repair.1000h.jpg|2004-06-07 repair invoice]] ($2196.62)
* [[:Image:2004-06-07 recpt 14 benz repair.1000h.jpg|2004-06-07 repair invoice]] ($2196.62)
* [[SvsG:Benz Rental Accounting|Benz Rental Accounting]]
* [[SvsG:Benz Rental Accounting|Benz Rental Accounting]]

Revision as of 23:10, 25 October 2006

For official details of the Benz Rental part of Staddon vs. Griever currently in dispute, see SvsG:Plaintiffs' Position Statement#Benz_Rental.

Nick Notes

  • Email from Lynne on 5/9 mentioned Benz in context of a functioning vehicle
  • Email from me to L&B on 7/18 mentions a "transmission issue" which may have been the electrical issue. Given that I was not notified when the vehicle became disabled, I will take that email's date as the date of disablement until convinced otherwise.
  • 2004-06-07 repair invoice ($2196.62)
  • Benz Rental Accounting